VSK+E 2028
1–4 February 2028 at Royal Jaarbeurs, Utrecht, Netherlands.
VSK+E is a trade fair for the building-services installation and electrical engineering sectors. Its scope brings heating, ventilation, plumbing, electrical engineering, and measurement and control technology into one professional setting. Visitors can use the exhibition to compare technical approaches, examine equipment and discuss how different systems fit real building and infrastructure projects.
VSK+E 2028 at a glance
| Item | Information |
|---|
| Event | VSK+E |
| Event type | Business trade fair |
| Category | Heating, cooling and ventilation systems; electrical engineering |
| Dates | 1–4 February 2028 |
| Opening hours | 1 February 09:30–17:30; 2 February 09:30–17:30; 3 February 09:30–20:30; 4 February 09:30–17:00 |
| City and country | Utrecht, Netherlands |
| Venue | Royal Jaarbeurs, halls 7–12 |
| Organiser | Jaarbeurs |
| Main sectors | Heating, ventilation, plumbing, electrical engineering, measurement and control |
| Main audiences | Installation professionals, engineers, technical managers, specifiers, distributors and suppliers |
| Exhibitor scale | The 2028 event preview lists more than 375 exhibitors |
The 2028 dates, venue and daily visitor hours are published. The event preview also describes knowledge sessions; check the organiser’s event information for the latest programme and participation details before planning.
Why VSK+E matters
Compare connected building systems
Heating, ventilation, plumbing and electrical systems interact in buildings. Seeing a range of installation technologies in one exhibition can help professionals compare how components, controls and services relate to the requirements of a project, instead of assessing each purchase in isolation.
Bring technical questions to suppliers
Installers, engineers and buyers can use product displays to check specifications, installation requirements, compatibility, servicing and support. A focused conversation is more useful when you arrive with a building type, project stage and technical constraints in mind.
Keep up with professional practice
The event includes knowledge sessions in spacious theatres. These provide a setting for sector discussion alongside the exhibition; the detailed 2028 programme should be checked when it is available.
Understand the scale
The organiser’s 2028 event preview lists more than 375 exhibitors. This is an announced figure for the upcoming event, not a measured attendance result from a completed edition.
Exhibition sectors and product groups at VSK+E
The event’s published scope covers W-installation and E-installation: building-services systems and electrical engineering. The product lines below are practical ways to organise a visit within those published sectors.
Heating and heat-pump systems
- Boilers, heat generators and heating appliances
- Heat pumps and associated system components
- Hydronic distribution, valves and circulation equipment
- Emitters, radiators and underfloor-heating components
- Controls and accessories for heating installations
Ventilation and indoor climate
- Ventilation units and air-handling equipment
- Ductwork, grilles, diffusers and air terminals
- Fans, filters and air-quality components
- Heat-recovery and ventilation-control equipment
- System components for indoor climate management
Plumbing and water installations
- Pipes, fittings, connectors and installation materials
- Valves, pumps and water-distribution components
- Sanitary installation equipment and fixtures
- Hot-water preparation and system accessories
- Tools and equipment for installation and maintenance
Electrical installation systems
- Wiring, cables and installation accessories
- Distribution boards and protective components
- Switches, sockets and connection equipment
- Building electrical systems and installation tools
- Components for integrating electrical equipment in buildings
Measurement, control and building automation
- Sensors and measurement instruments
- Thermostats and system controllers
- Control panels and monitoring components
- Regulation equipment for heating and ventilation systems
- Tools for commissioning, testing and fault-finding
Who should visit VSK+E?
Installation companies and service contractors
Useful if your work involves installing, commissioning or maintaining building-services systems. Prioritise equipment that fits your typical building types, installation methods and service capacity.
- Compare installation steps, access requirements and commissioning needs
- Ask about maintenance intervals, spare parts and technical support
- Check how controls and components work with systems you already install
- Evaluate tools that could improve installation or fault-finding work
Engineering, design and technical consultancy teams
Useful when you specify, design or review mechanical and electrical installations. Compare system options against project requirements rather than evaluating a product feature in isolation.
- Review performance data and the assumptions behind it
- Check space, connection, control and commissioning requirements
- Explore interfaces between heating, ventilation, plumbing and electrical systems
- Record documentation and standards questions for follow-up
Building owners, developers and facilities teams
Useful when planning a new installation, replacement or operational improvement. Focus on whole-life fit: how a solution could be installed, operated, maintained and integrated into the building.
- Compare system suitability for the building’s use and operating pattern
- Ask about controls, service requirements and expected maintenance
- Bring project constraints such as space, access and existing equipment
- Separate initial product claims from the evidence and assumptions behind them
Distributors, wholesalers and procurement teams
Useful when reviewing suppliers, adding products to a portfolio or checking technical coverage. Compare product ranges, documentation, availability terms and support arrangements directly with prospective suppliers.
- Identify gaps in your current heating, ventilation, plumbing or electrical range
- Compare product specifications and compatible accessories
- Ask about training, technical documentation and after-sales support
- Assess whether a supplier can serve your customer segments and delivery needs
Manufacturers and technology suppliers
VSK+E is relevant to companies presenting products and services for the installation industry. Use the event to explain practical applications, understand professional questions and assess whether your offer fits the needs of the Dutch and wider installation market.
- Prepare concise technical information and application examples
- Clarify installation, commissioning and service requirements
- Identify which professional groups are most relevant to your offer
- Check exhibitor participation, stand options and organiser requirements directly
Relevant roles include installers, electricians, service technicians, project engineers, mechanical and electrical consultants, technical managers, facilities professionals, buyers, category managers, wholesalers and business owners.
Why visit VSK+E?
- Compare system options: assess heating, ventilation, plumbing and electrical products against the demands of a specific project.
- Evaluate practical installation: ask about connection points, mounting, commissioning, compatibility and access for maintenance.
- Review controls and measurement: explore how sensors and regulation equipment can support the operation of building systems.
- Identify suppliers: shortlist companies whose product range, documentation and support match your project or customer needs.
- Improve technical knowledge: use the event’s knowledge sessions to follow relevant professional discussion, subject to the published programme.
- Build a focused comparison: record specifications, service conditions and next steps while details are fresh.
Why exhibit at VSK+E?
Manufacturers, equipment suppliers, distributors and service companies working in the installation and electrical engineering sectors may consider VSK+E when they want to present products to a professional trade audience. The event’s published scope spans W-installation and E-installation, with heating, ventilation, plumbing, electrical engineering and measurement and control represented.
Exhibiting can support several practical objectives: explaining technical applications face to face, gathering questions from professionals, showing how products fit into installation workflows, introducing a range to potential channel partners and discussing service or training requirements. These are objectives to plan for, not guaranteed outcomes; their value depends on audience fit, preparation and follow-up.
Before committing, define the product groups and visitor roles that matter most. Confirm the current exhibitor terms, stand availability, deadlines, technical services and event arrangements with the organiser. For international participation, check applicable product rules, refrigerant requirements where relevant, local distribution needs and the resources required to support installation and maintenance after a sale.
What makes VSK+E different?
Its published focus connects building-services installation with electrical engineering. The event is not limited to a single product family: its stated scope includes heating, ventilation, plumbing, electrical engineering, and measurement and control technology. That breadth can help visitors consider how separate systems interact in a building and give suppliers a setting to explain where their products fit across the installation chain.
The venue listing identifies halls 7–12 and describes knowledge sessions in spacious theatres. Together, the exhibition areas and session spaces make it possible to combine supplier conversations with professional learning. The exact 2028 session schedule should be checked as the organiser releases it.
What should you try to achieve at VSK+E?
A general aim such as “see what is new” is difficult to evaluate. Set a concrete question before arriving and choose a result you can check afterwards.
For installers and contractors
Identify three products or systems that could fit a defined type of installation, and record the installation, commissioning and service questions that remain.
For engineers and specifiers
Compare two or three technical approaches against one live project’s performance, space and control requirements.
For distributors and procurement teams
Shortlist suppliers for a specific product-range gap and document their specifications, support and commercial follow-up requirements.
For manufacturers and suppliers
Test whether your technical explanation answers the questions installers and engineering teams actually raise, then define a follow-up step for each relevant conversation.
How to prepare before VSK+E
1. Define the project or business question
Choose a clear reason for attending: replacing a heating system, comparing ventilation equipment, improving controls, reviewing electrical components or finding a supplier for a defined product group. Write down the building type, installation context and constraints that affect the decision.
2. Build a target list
Use the organiser’s current exhibitor information and event platform when available. Identify suppliers by product category and mark each as A (essential), B (useful) or C (if time allows). The official visitor information describes an event platform containing exhibitor, programme and floor-plan information for registered visitors; check access and availability for 2028.
3. Prepare technical questions
- Which system configurations and applications is the product designed for?
- What are the connection, power, space and access requirements?
- Which controls, sensors or other components are compatible?
- What commissioning steps and test equipment are required?
- What maintenance tasks, service intervals and spare parts should be planned?
- What performance data is available, and under which operating conditions was it measured?
- Which product standards, declarations or installation documents are supplied?
- How are refrigerants and servicing handled for relevant heat-pump or cooling equipment?
- What training or technical support is available to installers and distributors?
- What information is needed to confirm suitability for your project?
4. Bring useful project information
For a live project, bring non-confidential notes on building use, existing systems, available space, connection constraints, required controls, project timing and the decision criteria. Exact drawings or specifications can make conversations more productive, but share sensitive material only through appropriate channels.
5. Plan the visit around the published programme
Check the opening hours and the latest session schedule before you travel. Prioritise the exhibitors and sessions that relate directly to your objective; leave time to compare notes and revisit a supplier with a precise follow-up question.
How to make the most of VSK+E
Do not collect brochures without recording why a product matters. For each useful conversation, note:
- Company: the supplier and relevant contact or department
- Product: system, component or service discussed
- Fit: the building type, installation or customer need it could address
- Evidence: specifications, documents or test information to review
- Open question: compatibility, maintenance, availability or compliance point to confirm
- Next action: request documentation, arrange a technical call or compare with another option
When comparing alternatives, use the same criteria for each supplier. Distinguish confirmed specifications from verbal estimates, and record the operating conditions behind performance claims. If a product depends on other components or controls, ask what else is required for a complete installation.
Plan your time realistically
The venue listing places VSK+E across halls 7–12, so a simple route can help you protect time for priority conversations. Adapt the plan to the final floor plan and session timetable.
Morning
Start with the suppliers most closely tied to your main project or sourcing objective. Capture the key specification and compatibility questions before moving to secondary categories.
Midday
Compare related solutions across heating, ventilation, plumbing or electrical systems. Use a short break to consolidate notes and adjust your route rather than allowing an unplanned walk to displace priority visits.
Afternoon
Attend a relevant knowledge session if the published programme supports your objectives, then revisit shortlisted suppliers to resolve gaps or request technical documentation.
End of day
Review your notes, mark contacts by urgency and list the information needed before a purchase or specification decision. On 3 February the venue listing gives a later closing time of 20:30; the other public days close between 17:00 and 17:30.
Networking at VSK+E
Make introductions specific to your work. Explain the building type, installation challenge or product category you are assessing, then ask one focused question about the other person’s solution or requirements. For a supplier conversation, be ready to describe the relevant application and what would count as a suitable next step.
After a useful discussion, agree what information should be exchanged and when. A contact is more valuable when you record the context, the product discussed and the follow-up action rather than relying on memory after the exhibition.
VSK+E visitor profile and business opportunities
| Visitor profile | Potential focus at the exhibition |
|---|
| Installation contractors | Installation method, commissioning, service access and tools for heating, ventilation, plumbing or electrical work |
| Electricians and electrical contractors | Installation components, distribution, controls, measurement and system integration |
| Mechanical engineers and consultants | System specifications, performance data, compatibility and design constraints |
| Building owners and facilities teams | Replacement options, operation, maintenance and controls for building systems |
| Wholesalers and distributors | Supplier range, product documentation, channel fit and technical support |
| Manufacturers and technology suppliers | Professional feedback, application questions and potential distribution or service relationships |
These are practical visit priorities derived from the event’s published sectors. The best route depends on your project, responsibilities and the products confirmed in the current exhibitor information.
Travelling to VSK+E
Royal Jaarbeurs states that it is within walking distance of Utrecht Central Station and is accessible by public transport and car. The venue also has its own car parks. Check the venue’s current travel and parking arrangements before departure, as access details can change.
Venue address: Jaarbeursplein 6, 3521 AL Utrecht, Netherlands.
Practical information for international visitors
| Item | Information |
|---|
| Venue | Royal Jaarbeurs, Utrecht |
| Rail access | Utrecht Central Station is within walking distance of Jaarbeurs |
| Public transport | The venue describes Jaarbeurs as accessible by public transport |
| Car access | Jaarbeurs has its own car parks; confirm current arrangements before travelling |
| Daily hours | 09:30–17:30 on 1 and 2 February; 09:30–20:30 on 3 February; 09:30–17:00 on 4 February 2028 |
Before travelling internationally, check the requirements that apply to your nationality, arrange accommodation and transport, and confirm the event’s current registration and entry information. ilikevents can assist with visit planning, registration and travel arrangements.
After VSK+E: where the value starts
Review your notes while product details are still clear. Sort contacts into three groups:
- A — Immediate: a live project, a technical question or a supplier decision needs prompt follow-up.
- B — Potential: the product or relationship may fit, but needs comparison, specifications or internal review.
- C — Market information: the discussion was useful for tracking technologies, supplier ranges or professional priorities.
For a product under consideration, request the relevant technical documentation, compatibility details, maintenance information, installation requirements and commercial terms. Compare like with like, check that performance claims match your operating conditions and involve the colleagues responsible for design, installation, purchasing and service where appropriate.
Exhibitors can organise visitor conversations by application, customer type and agreed next step. Send the promised technical material, clarify outstanding requirements and distinguish a genuine project discussion from general interest. Use the event to inform decisions, not as a substitute for technical due diligence.
VSK+E visitor checklist
Before
- ☐ Define one primary technical or sourcing objective.
- ☐ Check current visitor registration, exhibitor information and the event platform.
- ☐ Mark priority suppliers and relevant knowledge sessions.
- ☐ Prepare project constraints and comparable questions for each supplier.
- ☐ Confirm venue access, travel arrangements and daily opening hours.
During
- ☐ Record product details, compatibility, evidence and open questions.
- ☐ Compare solutions using consistent criteria.
- ☐ Note each useful contact’s context and agreed next step.
- ☐ Keep time for priority halls and any relevant sessions.
After
- ☐ Follow up on promised documents and technical answers.
- ☐ Compare products against project needs and service requirements.
- ☐ Share relevant findings with colleagues and decision-makers.
- ☐ Record the next decision, owner and timing for each qualified contact.
Is VSK+E worth visiting?
VSK+E is most useful for professionals who work across building-services installation or electrical engineering and can connect the exhibition to a project, supplier review or defined learning objective. Installers may focus on practical fit and serviceability; engineers can compare specifications and system interfaces; buyers and distributors can assess product ranges and supplier support. The organiser’s preview lists more than 375 exhibitors for 2028, giving visitors a broad set of potential comparisons, while the knowledge sessions add a learning dimension. A clear route and well-prepared questions will make the visit more purposeful than walking the halls without a decision in mind.
Your VSK+E visit in Utrecht
What installation decision, supplier comparison or technical question do you want to take forward after the exhibition? Define it before you arrive, then use each conversation to build evidence for that decision.
Compare. Specify. Install. Follow up.
Building-services installation opportunities in the Netherlands
Market size and demand
Statistics Netherlands reports that heat pumps extracted 34 petajoules of heat from air and ground in the Netherlands in 2024. In its June 2026 release, CBS also reports that buildings used 32% renewable energy in 2025, while the Netherlands’ overall renewable share reached 22.7% of gross final energy consumption; the 2025 figures are provisional. These indicators measure renewable energy use, not the total heating, ventilation or installation market, but they show the relevance of heat-pump systems and building energy technologies to the event’s product scope.
Market drivers and possible commercial opportunities
- Heat-pump installation and service: the 34 PJ heat-pump contribution gives installers, equipment suppliers and distributors a reason to examine system components, controls, commissioning and maintenance needs. Project suitability, technical performance, installation capacity and economics still need to be assessed case by case.
- Building-system integration: renewable energy use in buildings makes it relevant to compare heating, ventilation, electrical and control solutions as connected systems. The figures do not establish demand for a specific product or project pipeline.
- Refrigerant-aware HVAC equipment: suppliers and service companies can evaluate equipment and training needs in light of current EU F-gas rules. Product choice and servicing obligations depend on the equipment and refrigerant involved.
Regulations and market-entry conditions
EU Regulation 2024/573 on fluorinated greenhouse gases entered into force on 11 March 2024. It is relevant to some refrigeration, air-conditioning and heat-pump equipment and related service work. Companies should check the regulation’s product-specific requirements, refrigerant restrictions and applicable technician-certification rules before selecting or marketing equipment; the event itself does not confirm regulatory compliance.
What this means for exhibitors
Manufacturers and distributors may use VSK+E to explain how their heating, ventilation, electrical or control products fit Dutch building applications, and to learn which technical and service questions local professionals raise. Any market-entry plan should be supported by product-specific compliance checks and a realistic route to installation and after-sales service.
What this means for visitors
Installers, engineers and building operators could use the exhibition to compare heat-pump, ventilation and control options, then assess them against their own project conditions and regulatory responsibilities. The CBS indicators provide national energy context, not a guarantee of project demand or commercial return.
Explore Event Opportunities
Use VSK+E to compare installation technologies, identify suppliers and plan a purposeful visit or exhibition presence, with practical support from ilikevents.
Get Expert Assistance from ilikevents to plan your visit or exhibition participation.
See the ilikevents services for this event
For further information, please click
here .